| Site |
Type |
Location |
Transect Distance |
|
Latitude (deg,min,sec) |
Longitude (deg,min,sec) |
Elevation (m) |
| GCE10 |
Hydrological well |
GCE10_W1 |
n/a |
GCE10 groundwater well 1 |
31 28 38.6 N |
081 16 16.1 W |
1.319 |
| GCE10 |
Hydrological well |
GCE10_W2 |
n/a |
GCE10 groundwater well 2 |
31 28 37.9 N |
081 16 15.8 W |
1.048 |
| GCE10 |
Hydrological well |
MW0201 |
n/a |
Ruppel hydrological well installation MW0201 at Moses Hammock (1.25in. inner diameter, 4.00in. bore-hole diameter, 15.042ft. plumb depth) |
31 28 41.6 N |
081 16 21.4 W |
n/a |
| GCE10 |
Hydrological well |
MW0202 |
n/a |
Ruppel hydrological well installation MW0202 at Moses Hammock (1.25in. inner diameter, 4.00in. bore-hole diameter, 14.833ft. plumb depth) |
31 28 41.6 N |
081 16 21.2 W |
n/a |
| GCE10 |
Hydrological well |
MW0203 |
n/a |
Ruppel hydrological well installation MW0203 at Moses Hammock (1.25in. inner diameter, 4.00in. bore-hole diameter, 14.583ft. plumb depth) |
31 28 41.6 N |
081 16 21.1 W |
n/a |
| GCE10 |
Hydrological well |
MW0204 |
n/a |
Ruppel hydrological well installation MW0204 at Moses Hammock (1.25in. inner diameter, 4.00in. bore-hole diameter, 16.167ft. plumb depth) |
31 28 41.6 N |
081 16 21.0 W |
n/a |
| GCE10 |
Hydrological well |
MW0205 |
n/a |
Ruppel hydrological well installation MW0205 at Moses Hammock (1.25in. inner diameter, 4.00in. bore-hole diameter, 12.250ft. plumb depth) |
31 28 46.1 N |
081 16 20.3 W |
n/a |
| GCE10 |
Hydrological well |
MW0206 |
n/a |
Ruppel hydrological well installation MW0206 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 14.875ft. plumb depth) |
31 28 42.1 N |
081 16 16.1 W |
n/a |
| GCE10 |
Hydrological well |
MW0207 |
n/a |
Ruppel hydrological well installation MW0207 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 12.708ft. plumb depth) |
31 28 41.9 N |
081 16 16.1 W |
n/a |
| GCE10 |
Hydrological well |
MW0208 |
n/a |
Ruppel hydrological well installation MW0208 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 16.880ft. plumb depth) |
31 28 42.2 N |
081 16 18.7 W |
n/a |
| GCE10 |
Hydrological well |
MW0209 |
n/a |
Ruppel hydrological well installation MW0209 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 15.555ft. plumb depth) |
31 28 39.2 N |
081 16 16.2 W |
n/a |
| GCE10 |
Hydrological well |
MW0210 |
n/a |
Ruppel hydrological well installation MW0210 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 16.375ft. plumb depth) |
31 28 39.7 N |
081 16 16.4 W |
n/a |
| GCE10 |
Hydrological well |
MW0211 |
n/a |
Ruppel hydrological well installation MW0211 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 16.725ft. plumb depth) |
31 28 24.4 N |
081 16 18.7 W |
n/a |
| GCE10 |
Hydrological well |
MW0212 |
n/a |
Ruppel hydrological well installation MW0212 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 17.575ft. plumb depth) |
31 28 42.4 N |
081 16 18.7 W |
n/a |
| GCE10 |
Hydrological well |
MW0213 |
n/a |
Ruppel hydrological well installation MW0213 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 18.635ft. plumb depth) |
31 28 41.2 N |
081 16 17.3 W |
n/a |
| GCE10 |
Hydrological well |
MW0214 |
n/a |
Ruppel hydrological well installation MW0214 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 16.925ft. plumb depth) |
31 28 41.9 N |
081 16 20.3 W |
n/a |
| GCE10 |
Hydrological well |
MW0215 |
n/a |
Ruppel hydrological well installation MW0215 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 16.025ft. plumb depth) |
31 28 42.0 N |
081 16 16.1 W |
n/a |
| GCE10 |
Hydrological well |
MW0216 |
n/a |
Ruppel hydrological well installation MW0216 at Moses Hammock (2.00in. inner diameter, 3.00in. bore-hole diameter) |
31 28 41.6 N |
081 16 21.4 W |
n/a |
| GCE10 |
Hydrological well |
MW0218 |
n/a |
Ruppel hydrological well installation MW0218 at Moses Hammock (2.00in. inner diameter, 3.00in. bore-hole diameter) |
31 28 38.5 N |
081 16 16.1 W |
n/a |
| GCE10 |
Hydrological well |
MW0219 |
n/a |
Ruppel hydrological well installation MW0219 at Moses Hammock (2.00in. inner diameter, 3.00in. bore-hole diameter) |
31 28 37.9 N |
081 16 15.8 W |
n/a |
| GCE10 |
Hydrological well |
MLS0201 |
n/a |
Ruppel hydrological well installation MLS0201 at Moses Hammock (0.13in. inner diameter, 1.00in. bore-hole diameter) |
31 28 41.6 N |
081 16 20.9 W |
n/a |
| GCE10 |
Hydrological well |
MLS0202 |
n/a |
Ruppel hydrological well installation MLS0202 at Moses Hammock (0.13in. inner diameter, 1.00in. bore-hole diameter) |
31 28 41.8 N |
081 16 20.6 W |
n/a |
| GCE10 |
Hydrological well |
MLS0203 |
n/a |
Ruppel hydrological well installation MLS0203 at Moses Hammock (0.13in. inner diameter, 1.00in. bore-hole diameter) |
31 28 42.1 N |
081 16 19.9 W |
n/a |
| GCE10 |
Hydrological well |
MLS0204 |
n/a |
Ruppel hydrological well installation MLS0204 at Moses Hammock (0.13in. inner diameter, 1.00in. bore-hole diameter) |
31 28 43.4 N |
081 16 18.5 W |
n/a |
| GCE10 |
Hydrological well |
MLS0205 |
n/a |
Ruppel hydrological well installation MLS0204 at Moses Hammock (0.13in. inner diameter, 1.00in. bore-hole diameter) |
31 28 43.3 N |
081 16 18.5 W |
n/a |