Home > Study Site > Location Search > Search Results
 

Location Search Results

Revise Search, Google Earth, Spreadsheet
  Ascending Descending Page 1 of 4  
Site Type Location Transect Distance Latitude (deg,min,sec) Longitude (deg,min,sec) Elevation (m)
GCE10 Hydrological well GCE10_W1 n/a GCE10 groundwater well 1 31 28 38.6 N 081 16 16.1 W 1.319
GCE10 Hydrological well GCE10_W2 n/a GCE10 groundwater well 2 31 28 37.9 N 081 16 15.8 W 1.048
GCE10 Hydrological well MW0201 n/a Ruppel hydrological well installation MW0201 at Moses Hammock (1.25in. inner diameter, 4.00in. bore-hole diameter, 15.042ft. plumb depth) 31 28 41.6 N 081 16 21.4 W n/a
GCE10 Hydrological well MW0202 n/a Ruppel hydrological well installation MW0202 at Moses Hammock (1.25in. inner diameter, 4.00in. bore-hole diameter, 14.833ft. plumb depth) 31 28 41.6 N 081 16 21.2 W n/a
GCE10 Hydrological well MW0203 n/a Ruppel hydrological well installation MW0203 at Moses Hammock (1.25in. inner diameter, 4.00in. bore-hole diameter, 14.583ft. plumb depth) 31 28 41.6 N 081 16 21.1 W n/a
GCE10 Hydrological well MW0204 n/a Ruppel hydrological well installation MW0204 at Moses Hammock (1.25in. inner diameter, 4.00in. bore-hole diameter, 16.167ft. plumb depth) 31 28 41.6 N 081 16 21.0 W n/a
GCE10 Hydrological well MW0205 n/a Ruppel hydrological well installation MW0205 at Moses Hammock (1.25in. inner diameter, 4.00in. bore-hole diameter, 12.250ft. plumb depth) 31 28 46.1 N 081 16 20.3 W n/a
GCE10 Hydrological well MW0206 n/a Ruppel hydrological well installation MW0206 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 14.875ft. plumb depth) 31 28 42.1 N 081 16 16.1 W n/a
GCE10 Hydrological well MW0207 n/a Ruppel hydrological well installation MW0207 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 12.708ft. plumb depth) 31 28 41.9 N 081 16 16.1 W n/a
GCE10 Hydrological well MW0208 n/a Ruppel hydrological well installation MW0208 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 16.880ft. plumb depth) 31 28 42.2 N 081 16 18.7 W n/a
GCE10 Hydrological well MW0209 n/a Ruppel hydrological well installation MW0209 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 15.555ft. plumb depth) 31 28 39.2 N 081 16 16.2 W n/a
GCE10 Hydrological well MW0210 n/a Ruppel hydrological well installation MW0210 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 16.375ft. plumb depth) 31 28 39.7 N 081 16 16.4 W n/a
GCE10 Hydrological well MW0211 n/a Ruppel hydrological well installation MW0211 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 16.725ft. plumb depth) 31 28 24.4 N 081 16 18.7 W n/a
GCE10 Hydrological well MW0212 n/a Ruppel hydrological well installation MW0212 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 17.575ft. plumb depth) 31 28 42.4 N 081 16 18.7 W n/a
GCE10 Hydrological well MW0213 n/a Ruppel hydrological well installation MW0213 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 18.635ft. plumb depth) 31 28 41.2 N 081 16 17.3 W n/a
GCE10 Hydrological well MW0214 n/a Ruppel hydrological well installation MW0214 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 16.925ft. plumb depth) 31 28 41.9 N 081 16 20.3 W n/a
GCE10 Hydrological well MW0215 n/a Ruppel hydrological well installation MW0215 at Moses Hammock (2.00in. inner diameter, 4.00in. bore-hole diameter, 16.025ft. plumb depth) 31 28 42.0 N 081 16 16.1 W n/a
GCE10 Hydrological well MW0216 n/a Ruppel hydrological well installation MW0216 at Moses Hammock (2.00in. inner diameter, 3.00in. bore-hole diameter) 31 28 41.6 N 081 16 21.4 W n/a
GCE10 Hydrological well MW0218 n/a Ruppel hydrological well installation MW0218 at Moses Hammock (2.00in. inner diameter, 3.00in. bore-hole diameter) 31 28 38.5 N 081 16 16.1 W n/a
GCE10 Hydrological well MW0219 n/a Ruppel hydrological well installation MW0219 at Moses Hammock (2.00in. inner diameter, 3.00in. bore-hole diameter) 31 28 37.9 N 081 16 15.8 W n/a
GCE10 Hydrological well MLS0201 n/a Ruppel hydrological well installation MLS0201 at Moses Hammock (0.13in. inner diameter, 1.00in. bore-hole diameter) 31 28 41.6 N 081 16 20.9 W n/a
GCE10 Hydrological well MLS0202 n/a Ruppel hydrological well installation MLS0202 at Moses Hammock (0.13in. inner diameter, 1.00in. bore-hole diameter) 31 28 41.8 N 081 16 20.6 W n/a
GCE10 Hydrological well MLS0203 n/a Ruppel hydrological well installation MLS0203 at Moses Hammock (0.13in. inner diameter, 1.00in. bore-hole diameter) 31 28 42.1 N 081 16 19.9 W n/a
GCE10 Hydrological well MLS0204 n/a Ruppel hydrological well installation MLS0204 at Moses Hammock (0.13in. inner diameter, 1.00in. bore-hole diameter) 31 28 43.4 N 081 16 18.5 W n/a
GCE10 Hydrological well MLS0205 n/a Ruppel hydrological well installation MLS0204 at Moses Hammock (0.13in. inner diameter, 1.00in. bore-hole diameter) 31 28 43.3 N 081 16 18.5 W n/a
 
LTER
NSF

This material is based upon work supported by the National Science Foundation under grants OCE-9982133, OCE-0620959, OCE-1237140, OCE-1832178 and OCE-2425396. Any opinions, findings, conclusions, or recommendations expressed in the material are those of the author(s) and do not necessarily reflect the views of the National Science Foundation.