Sapelo Research Application FormResearch Application ID: GCE-37-2012 (submitted: 10/05/2012, status: approved)Provide a brief title for web displayMicrometeorological flux tower installation Investigator InformationOn Island Sponsor: GCE SINERR UGAMI GADNR
Briefly describe the project goals and methodologyThe purpose of this research is to evaluate the exchange of gases between salt marshes and the atmosphere, in order to understand the role that these wetlands play in the carbon cycle, to be able to model water flow in the Duplin River, and to be in a position to predict the effects of future changes such as sea level rise. We will install an eddy covariance flux tower in a Spartina alterniflora dominated marsh at the head of a small creek off the Duplin River to study exchange of heat, water and carbon between the marsh and the atmosphere. Data collected from this instrumentation and research results obtained will also benefit the Sapelo Island National Estuarine Research Reserve (SINERR) in understanding climate change, sea level rise and marshland response. Where will the project be located?Duplin River, 31°26'38.56" N, 81°17'0.70"W, see attached permit application for further details How will you provide GPS coordinates for study sites?GPS coordinates are listed in the project location field What are the expected start and end dates of the project?Start Date: 11/01/2012 End Date: (ongoing) How many people will access the site and at what frequency?2 people daily for installation of boardwalk and platform, then 2 people for monthly maintenance. Keywords that describe your projectWhat equipment will be deployed in the field?The eddy covariance flux tower is an advanced weather station that not only measures standard meteorological parameters but also carbon and water concentrations at fast sampling rates. Instrumentation on the tower will include two sonic anemometers and two closed-path infrared gas analyzers to measure the three-dimensional wind vector, air temperature, and concentrations of CO2 and H2O at two heights. Other instrumentation will include soil sensors (soil heat plates, an averaging thermocouple, a soil water content reflectometer, and a pressure transducer for water level), atmospheric sensors (humidity, temperature, pressure, rainfall), up and down looking radiation sensors (short wave, long wave and photosynthetically active radiation) and a digital camera to document the growth cycle of Spartina alterniflora. The tower will be powered by solar panels placed within 30 feet of the tower that recharge a bank of batteries housed on the flux tower platform. Will plants or animals be collected as part of this study?No. What are the likely impacts of the project on the site?The flux tower itself will be about 30 feet tall erected on a platform 5′x5′ square. It will be powered by 6 solar panels and accessed via a boardwalk for servicing and maintenance (approximately once a month). The boardwalk will be approximately 220 m in length and will be constructed from the head of Factory Creek to the tower site. Access from the head of Factory Creek is shorter than access from the Duplin River and it is also isolated from general boating traffic. We do not want unauthorized people having access to the flux tower. The total square footage over vegetated marsh for this project is approximately: 26(tower platform)+24(solar panels)+843(boardwalk)=892 sqft. Will the project design include boardwalks? If not, explain why not.Yes. In order to limit the impact on the Spartina marsh we will install a boardwalk. This area is dominated by medium and short Spartina alterniflora that will grow to heights of approximately 0.5-1 m and 0.05-0.5 m, respectively. In order to minimize our impact, the decking material that will be used is ThruFlow flooring system (http://www.thruflow.com/) so that light can penetrate to the marsh surface. For a deck raised 3 feet from the marsh surface, 70% of the light availability will penetrate to the surface below, thus allowing Spartina alterniflora to grow beneath the tower platform and boardwalk. The decking will be raised 3 feet (0.9 m) above the marsh surface. According to real time kinematic (RTK) satellite navigation surveys the marsh elevation at this location is approximately 2.0 m above MLLW. Since the highest tide is 2.9 m relative to MLLW, the boardwalk and platform will be at a level of the highest tide that floods the marsh. How long will impacts persist after the research is concluded?Boardwalk and platform will be removed when the project is completed unless we or SINERR use them for a new project. Research Permits:U.S. Army Corps of Engineers: GCE-37-2012_Permit_ACOE (10/23/2012-10/23/2014) Georgia DNR Coastal Resources Division: GCE-37-2012_Permit_CMPA_803 (07/26/2022-07/26/2027) Georgia DNR Coastal Resources Division: GCE-37-2012_Permit_Flux_Tower_CRD_permit (12/02/2012-indefinite) Study Area Map:Files attached to this applicationGCE-37-2012_General_AppendixB_2012_PCN_Form-DiIorio.pdf (PDF file, 1113.01 kb, submitted 10/05/2012) GCE-37-2012_General_scanned_flux_tower_permit.pdf (PDF file, 1588.57 kb, submitted 10/05/2012) GCE-37-2012_Maps_DiIorio_Flux_Tower.kmz (Compressed KML file, 0.68 kb, submitted 10/06/2012) |
|||||||||||||||||||||||||||||
| 21-Aug-2025 | Contact Us | Privacy | ||||||||||||||||||||||||||||
This material is based upon work supported by the National Science Foundation under grants OCE-9982133, OCE-0620959, OCE-1237140, OCE-1832178 and OCE-2425396. Any opinions, findings, conclusions, or recommendations expressed in the material are those of the author(s) and do not necessarily reflect the views of the National Science Foundation.