Sapelo Research Application FormResearch Application ID: GCE-83-2017 (submitted: 04/20/2017, status: approved)Provide a brief title for web displayDuplin River Groundwater Assessment Investigator InformationOn Island Sponsor: GCE SINERR UGAMI GADNR
Briefly describe the project goals and methodologyOur goals during this research effort will include: 1) continue our annual radon time-series measurements at 3 locations in the Duplin River to evaluate groundwater inputs to the Duplin River; 2) expand these time-series measurements to include the UGA boat dock on Post Office Creek; (3) survey radon activities throughout several tidal creeks to assess groundwater inputs at the creek-scale; (4) characterize the groundwater radon endmember composition at each site, Where will the project be located?Dock and surrounding marsh at Marsh Landing: 31°25'4.11"N 81°17'46.51"W Dock and surrounding marsh at Lumber Landing: 31°27'35.92"N 81°16'38.46"W Dock and surrounding marsh at Moses Hammock: 31°28'44.14"N 81°16'23.11"W UGA boat dock: 31°26' 3.99"N 81°16' 52.54"W and throughout Post Office Creek Throughout tidal creek with mouth located at: 31°27' 36.49"N 81°16' 51.79"W How will you provide GPS coordinates for study sites?GPS coordinates are listed in the project location field What are the expected start and end dates of the project?Start Date: 07/05/2017 End Date: 07/27/2017 How many people will access the site and at what frequency?A maximum of 3 people will access the sites several times daily during the fieldwork Keywords that describe your projectWhat equipment will be deployed in the field?One plastic box at each site containing radon measuring gear and power supply for bilge pumps. A weight will be deployed to the bottom that houses each water level logger. All of the field equipment will be removed at the end of the 3 week field effort. Will plants or animals be collected as part of this study?No What are the likely impacts of the project on the site?There will be no impacts from this work. Will the project design include boardwalks? If not, explain why not.No. The length of time required for the field observations do not warrant the construction of boardwalks. How long will impacts persist after the research is concluded?n/A Study Area Map:Files attached to this applicationGCE-83-2017_Maps_Radon_sites.kml (KML file, 4.34 kb, submitted 04/21/2017) |
|||||||||||||||||||||||||||||
| 21-Aug-2025 | Contact Us | Privacy | ||||||||||||||||||||||||||||
This material is based upon work supported by the National Science Foundation under grants OCE-9982133, OCE-0620959, OCE-1237140, OCE-1832178 and OCE-2425396. Any opinions, findings, conclusions, or recommendations expressed in the material are those of the author(s) and do not necessarily reflect the views of the National Science Foundation.